The City implemented street indexing signs during Fiscal Year 2011 as a
way to better serve its residents and businesses. Due to its success, the City will continue installation of street indexing signs at the master parking commercial corridors along Sample and Wiles
Roads.
The signs will continue to be placed at mid-block locations to provide the
specific address range within a block, resulting in better visability and facilitating the search of business locations.
The second phase of the project will be located along both sides of
Sample Road extending from Coral Springs Drive to University Drive and
along the north side of Sample Road between Riverside Drive and Rock
Island Road. Wiles Road signage will be on the south side of the street
between Coral Ridge Drive and Coral Springs Drive, and along the south side
of the street between Riverside Drive and Rock Island Road.
Cypress Park Playground Improvement
Before
After
Project Begins: June 2011 Projected Completion: August 2011 Budget: $100,000 Contractor: Advanced Recreational Concepts Equipment: Playcraft Systems Description: The new playground will feature two structures, one for children 2-5 years old, the second 5-12 years old. The will feature shade canopies as well as a double bay swing set for kids of all ages. The playground will be the City's first to feature synthetic grass, an accessible safety surface that looks like grass, but provides the necessary fall height protections required on playgrounds.
Past Projects
Mullins Parking Lot and Entrance Road Improvements
After
Completion Date: March 2011 Budget: $500,000 Contractor: Coral Hills Construction Description: Providing additional parking capacity and aesthetic enhancements