(A) Expired Permit Fees

1 Renewal-expired permits - All disciplines:    

a. Fifty percent (50%) of original master permit fee, minimum… 103.77  
(B) Miscellaneous Fees

1 All construction include educational & training fees (per thousand of estimated cost) 0.21  
2 Electronic water meters, per building 59.14  
3 Retrofit burglar alarms, per building* (state law governs) NO CPI INCREASE ALLOWED 55.00  
4 Certificate of occupancy:    

    a. Standard - No Charge N/C  

    b. Temporary, per residential units, per unit per 30 days 64.59  

    c. Temporary, partial or stocking for commercial and other non-residential buildings (for each 30 day period):  238.67  
5 Permit card replacement- all disciplines 19.19  
6 Temporary construction-related structure 64.59  
7 Public art fees    

a. New building construction / redevelopment:
 

    1. Public Art fund contribution, per sqft of gross floor area 0.51  

    2. On site artwork, per sqft of gross floor area 0.66  

b. Remodeling/converting:    

    1. Public Art contribution, per sqft of gross floor area being remodeled 0.25  

    2. On site artwork, per sqft of gross floor area being remodeled 0.33  
8 Temporary Use Permit 64.59  
(C ) Building Permit Fees

1 New Construction - residential    

    a. New Construction - Residential: Structural - % of total construction value 0.90%  

    b. New Construction - Residential: Electrical - % of total construction value 0.33%  

    c. New Construction - Residential: Plumbing - % of total construction value 0.15%  

    d. New Construction - Residential: Mechanical - % of total construction value 0.14%  
2 New Construction - commercial    

    a. New Construction - Commercial: Structural - % of total construction value 0.64%  

    b. New Construction - Commercial: Electrical - % of total construction value 0.36%  

    c. New Construction - Commercial: Plumbing - % of total construction value 0.09%  

    d. New Construction - Commercial: Mechanical - % of total construction value 0.06%  
3 Residential additions    

    a. Residential Additions: Structural 2.90%  

    b. Residential Additions: Electrical 0.83%  

    c. Residential Additions: Plumbing 1.24%  

d. Residential Additions: Mechanical 0.62%  
4  Residential Alterations:     

    a. Structural: % of total construction value unless otherwise provided below, in subsections (1), (2) 3.0%  

      (1) The value of counter tops shall be deducted from the total construction value.    

      (2) The value of cabinet replacement only will be a min. of $176.40 or 2% of total construction value, whichever is greater shall be charged herein 176.40  

    b. Electrical: % of total construction value 0.93%  

    c. Plumbing: % of total construction value 1.14%  

    d. Mechanical:  % of total construction value  1.14%  
5 Commercial alterations/additional/tenant improvements:    

    a. Structural:  % of total construction value   1.97%  

    b. Electrical:  up to - $124,524 -% of total construction value 1.86%  

                   over $124,524  -  per inspection 57.07  

                   per hour plan review fee 106.88  

    c. Plumbing: Up to  $124,524   -  % of total construction value 1.34%  

                     over $124,524 - per inspection 57.07  

                     per hour plan review fee 106.88  

    d. Mechanical: Up to   $120,000  -  % of total construction value 0.83%  

                     over $120,000 - per inspection 57.07  

                     per hour plan review fee 106.88  
6 Re-inspection - all disciplines (each re-inspection): 52.14  

Upon fifth and subsequent disapprovals, and without a certified supervisor or representative at the job site at time of inspection, the applicable fee shall be doubled. "Certified," for the purposes of this ordinance, shall include the following:
 

    a.The qualifier (person authorized by state and county authorities to apply for and receive a building permit); or
 

    b. A representative for the contractor that has a recognized master (or Class "A" certified) or journeyman status in the appropriate trade; or
 

    c. A representative for the contractor that has a State of Florida license in architecture or engineering and has sufficient education and knowledge in the appropriate field.
 
7 Lost plan review  (replacement of on-site plans: sfr, multi, commercial, covers all disciplines)  79.64  
8 Plan re-submittal fee  (for 3rd and subsequent re-submittals)  52.14  
9 Open permit request - per request 32.94  
10 Change in contractor and/or subcontractor - all disciplines  39.69  
11 Contractor overtime request-plan review per hr, minimum 91.31  
12 Expedited plan review, per hour, per trade (one hour minimum) 91.31  
(D) Structural Permit Fees

1 Administrative fees 59.14  
2 Awning (each): Base fee 82.75

                         plus per awning 26.98  
3 Deck (wood) 171.22  
4 Demolition/blasting 97.80  
5 Fence - base fee 59.14  

             plus, per lineal foot 0.25  
6 Landscape affidavit 39.69  
7 Garage door 64.59  
8 Gutters 64.59  
9 House moving filing fee within the City of Coral Springs 263.83  
10 Hurricane Shutters ( SFR duplex, triplex - each multi-family, commercial, per floor):    

    a.  1-3 shutters 64.59  

    b.  Each additional shutter 5.44  
11 Major plan revision (work not to exceed 1 hour) 110.77  
12 Masonry wall - base fee 64.59  

                         plus, per lineal foot 0.45  
13 Minimum fee (one inspection) 59.14  
14 Minor plan revision (corrections, lost plans, work not to exceed 15 minutes) 40.72  
15 Pool/spa/hot tub 151.76  
16 Roofs/re-roofs:    

    a. Flat re-roof: 127.89

    b. Flat re-roof ( commercial):    

       1. First 50 squares 127.89  

       2. Each additional 50 squares 59.14  

    c. Re-roof slope 160.32  

    d. Roof repair (2 squares and under) 59.14  

    e. Roof slope and flat 290.55  
17 Satellite dish ( over 18" requires separate electric permit) 84.83  
18 Screen enclosure - pool 110.77  
19 Signs (unlighted, permanent or temporary) 84.83  
20 Slab ( porch, patio, monolithic)  91.31  
21 Tent ( any size, each) 59.14  
22 Trailer (construction, storage, each) 157.21  
23 Window/door replacement 59.14  

                plus  $5.44  per unit    
24 Demolition   97.80  
25 Per hour plan review fee ( minimum of one hour) 88.20  
 (E ) Electrical Permit Fees

1 A/C change out 96.76  
2 Meter can 59.14  
3 Burglar alarm, new and retrofit (per floor up to 6 units) with each additional unit at a cost of $5.25 each: 55.00  
4  Commercial site lighting:    

    a.  1-3 light standards 59.14  

    b.  Each additional light standard 13.49  
5 Computer systems (commercial, per floor) 121.67  

Computer systems pre-wire (per floor) 59.14  
6 Electric sign (each) 96.76  
7 Electronic water meters, per unit 7.78  
8 Energy management system 59.14  
9 Fire alarm ( sfr, duplex, triplex - each multifamily, commercial, per floor) 147.35  
10 Heat pump 112.84  
11 Low voltage- individual systems per system (minimum fees):    

    a.Sprinkler time clock, new installations only :    

       1. 1-3 time clocks 59.14  

       2. each additional time clock 7.78  
12 Major plan revision (work not to exceed 1 hour) 110.77  
13 Minimum fee (one inspection) 59.14  
14 Minor plan revision ( corrections, lost plan, work not to exceed 15 min) 40.72  
15 Pool/spa/hot tub/fountain 176.40  
16 Pool alarm system 59.14  
17 Radon mitigation (per unit) 59.14  
18 Satellite dish ( requires separate structural permit)  103.25  
19     a. Service Change:  Residential 95.72  

    b. Service Change:  Commercial 121.67  
20 Sprinkler Pump, heat pump 110.77  
22 Temporary electric 79.64  

  30-day temporary electric 51.10  
23 Trailer (construction, sales, etc…) 100.13  
24 Demolition 97.80  
25 Per hour plan review fee ( a minimum of one hour) 88.20  
(F) Plumbing Permit Fees

1 Backflow preventer (new installation only), min. fee 84.83  
2 Electronic water meters, per unit 6.48  
3 Fire sprinkler system 201.31  
4 Gas pool heater 65.63  
5 LP Gas system ( 1 tank, 1 meter, 2 outlets)  65.63  
6 LP Gas tank(s) 65.63  
7 Major plan revision (work not to exceed 1 hour) 110.77  
8 Minimum fee (one inspection) 59.14  
9 Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) 40.72  
10 Sewer hook-up 65.63  
11 Site work, drainage, water mains, fire, sewer mains - % of contract price  2%  
12 Solar pool heater/water heater 84.83  
13 Water heater (domestic water) 65.63  
14 Water well 2" - 4 1/2 " 65.63  
15 Demolition 97.80  
16 Per hour plan review fee ( minimum of one hour) 88.20  
(G) Mechanical Permit Fees

1 A/C change out 97.80  
2 Gas, pool heater 65.63  
3 LP Gas system (1 tank, 1 meter, 2 outlets) 65.63  
4 LP Gas tank(s) 65.63  
5 Major plan revision (work not to exceed 1 hour) 110.77  
6 Minimum permit (one inspection) 59.14  
7 Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) 40.72  
8 Radon mitigation  65.63  
9 Demolition 97.80  
10 Per hour plan review fee ( a minimum of one hour) 88.20  

In addition to the fees above, the applicant should review the requirements of Chapter 5 of the Code of Ordinances and any other applicable codes.    

Zoning:

(1) Zoning Compliance Letter 144.24  
(2) Re-inspection:
 

    a.  Single-Family/Duplex 59.14  

    b.  Multi-Family 176.40  

    c.  Non-Residential 176.40  
(3) Sign review for installation or alteration 84.05  
(4) Expedited plan review, per hour (one hour minimum) 91.31  

Fire:


Plan Review:
 

    a. 2,500 sqft and under
198.20  

    b. More than 2,500 sqft Plus, per sqft $.06 198.20  

    c. Single station smoke detector, per residential unit 61.22  

    d. Major plan revision, per hour 101.69  

    e. Minor plan revisions (correction, lost plans-Review not to exceed 15 minutes) 24.90  

    f. Expedited plan review, per hour ( one-hour minimum) 92.35  
(8) Re-inspection Fee 189.89  

Sec. 3-7. Engineering Administrative and User Fees.


Development services/engineering administrative and user fees shall be as follows:    
(1) Land clearing permit 198.20  
(2) Renewal of land clearing permit 59.14  
(3) Excavation permit 198.20  
(4) Renewal of excavation permit 59.14  
(5) Land filling permit 181.59  
(6) Renewal of land filling permit 59.14  
(7) Permit for installation and connection of sewers:    

    a. Residential 39.43
 

    b.Commercial 64.33  

    c. Industrial 130.75  
(8) Improvements within public rights-of-way

 

    a. Per lance cut for pavement excavation
203.38
 

    b. Per each 100 linear feet of off-pavement excavation
78.86
 

    c. Driveway permit
130.75
 

    d. Lost plans - Driveways only
78.86
 

    e .All other improvements not specified above
81.97
 
(9) Excavation in right-of-way
   

(other than driveway approach or apron), cash bond of 2,509.15  
(10) Publicly dedicated easements:    

    a. Dedication 414.04  

    b. Vacation 414.04  
(11) Engineering fee for on-site water and sewer connections:
 

2% of construction costs (minimum of $392.25)
 
(12) Change of contractor
39.43  
(13) Overtime request - Inspections, per hour
181.59  
(14) Overtime request - Plan review, per hour
181.59  
(15) Expedited plan review, per hour (one hour minimum)
181.59  
(16) Lost plan reviews (replacement of on-site plans)
181.59  
(17) MS4/NPDES, per inspection (not to exceed $250.00)
56.03  
(18) Plan revision fee
181.59  
(19) Re-inspection fee
120.37  
(20) Work without a permit: Double permit fee