(A) Expired Permit Fees

1 Renewal-expired permits - All disciplines:    

a. Fifty percent (50%) of original master permit fee, minimum… 103.77  
       
(B) Miscellaneous Fees

1 All construction include educational and technology fees for the benefit of the Building Department (per thousand of estimated cost) 0.61  
2 Certificate of occupancy:    

    a. Standard - No Charge N/C  

    b. Temporary, per residential units, per unit per 30 days 75.00  

    c. Temporary, partial or stocking for commercial and other non-residential buildings: 238.67  
3 Permit card replacement- all disciplines 20.00  
4 Temporary Use Permit 75.00  
       
(C ) Building Permit Fees

1 New Construction - Residential and Commercial    

    a. New Construction - Structural - % of total construction value 0.77%  

    b. New Construction - Electrical - % of total construction value 0.34%  

    c. New Construction - Plumbing - % of total construction value 0.10%  

    d. New Construction - Mechanical - % of total construction value 0.12%  
2 Construction including Residential and Commercial Alterations and Additions:    

    a. Structural - Percent of total construction value 1.90%  

    b. Electrical - Percent of total construction value 0.83%  

    c. Plumbing - Percent of total construction value 1.15%  

    d. Mechanical - Percent of total construction value 0.62%  
3 Lost plans review (replacement of on-site plans: sfr, multi, commercial, covers all disciplines) 80.00  
4  Plan resubmittal fee (for 3rd and subsequent resubmittals) 55.00  
5 Open permit request - per request 40.00  
6 Change in contractor and/or subcontractor - all disciplines 40.00  
7 Contractor overtime request-plan review per hr, minimum 91.31  
8 Expedited plan review, per hour, per trade (one hour minimum) 91.31  
9 Administrative Fee for Engineering Permits 20.00  
10 Early Start Approval 50.00  
       
(D) Structural Permit Fees

1 Administrative fees 88.00  
2 Awning (each): Base fee 120.00

                         plus per awning 40.00  
3 Deck (wood) 225.00  
4 Demolition 125.00  
5 Fence - base fee 88.00  

             plus, per lineal foot 0.30  
6 Landscape affidavit 65.00  
7 Garage door 140.00  
8 Gutters 140.00  
9 House moving filing fee within the City of Coral Springs 300.00  
10 Hurricane Shutters ( sfr, duplex, triplex - each multifamily, commercial, per floor):    

    a.  1-3 shutters 120.00  

    b.  Each additional shutter 10.00  
11 Masonry wall - base fee 140.00  

                         plus, per lineal foot 0.75  
12 Minimum fee (one inspection) 88.00  
13 Plan review (per 1/4 hour, minimum 1/2 hour) 25.00  
14 Pool/spa/hot tub 200.00  
15 Roofs/re-roofs:    

    a. Flat re-roof: 175.00

       1. First 50 squares 175.00  

       2. Each additional 50 squares 75.00  

    b. Re-roof slope 200.00  

    c. Roof repair (2 squares and under) 75.00  

    d. Roof slope and flat 375.00  
16 Satellite dish ( over 18" requires separate electric permit) 120.00  
17 Screen enclosure - pool 185.00  
18 Signs (unlighted, permanent or temporary) 125.00  
19 Slab ( porch, patio, monolithic)  120.00  
20 Tent ( any size, each) 75.00  
21 Trailer (construction, storage, each) 200.00  
22 Window/door replacement 75.00  

                plus  $10.00  per unit 10.00  
23 Kitchen Cabinet replacement only, no structural work required   0  
       
 (E ) Electrical Permit Fees

1 A/C change out 110.00  
2 Meter can 75.00  
3 Burglar alarm, new and retrofit (per floor up to 6 units) with each additional unit at a cost of $8.50 each: 55.00  
4  Commercial site lighting:    

    a.  1-3 light standards 75.00  

    b.  Each additional light standard 18.00  
5 Computer systems (commercial, per floor) 140.00  

Computer systems pre-wire (per floor) 75.00  
6 Electric sign (each) 125.00  
7 Electronic water meters, per unit 10.00  
8 Energy management system 75.00  
9 Fire alarm ( sfr, duplex, triplex - each multifamily, commercial, per floor) 175.00  
10 Heat pump 115.00  
11 Low voltage- individual systems per system (minimum fees):    

a. 1. Sprinkler time clock, new installations only : 1-3 time clocks 88.00  

     2. each additional time clock 10.00  
12 Minimum fee (one inspection) 88.00  
13 Pool/spa/hot tub/fountain 200.00  
14 Pool alarm system 115.00  
15 Radon mitigation (per unit) 115.00  
16 Satellite dish ( requires separate structural permit)  125.00  
17     a. Service Change:  Residential 100.00  

    b. Service Change:  Commercial 125.00  
18 Sprinkler Pump, heat pump 120.00  
19 Temporary electric 100.00  

  30-day temporary electric 50.00  
20 Trailer (construction, sales, etc…) 125.00  
21 Demolition 125.00  
22 Plan review (per ¼ hour, minimum ½ hour) 25.00  
       
(F) Plumbing Permit Fees

1 Backflow preventer (new installation only), min. fee 100.00  
2 Electronic water meters, per unit 10.00  
3 Fire sprinkler system 250.00  
4 Gas pool heater 75.00  
5 LP Gas system ( 1 tank, 1 meter, 2 outlets)  75.00  
6 LP Gas tank(s) 75.00  
7 Minimum fee (one inspection) 85.00  
8 Plan review (per 1/4 hour, minimum 1/2 hour) 25.00  
9 Sewer hook-up 75.00  
10 Site work, drainage, water mains, fire, sewer mains - % of contract price  2%  
11 Solar pool heater/water heater 100.00  
12 Water heater (domestic water) 75.00  
13 Water well 2" - 4 1/2 " 75.00  
14 Demolition 125.00  
15 Irrigation System 150.00  
       
(G) Mechanical Permit Fees

1 A/C change out 110.00  
2 Gas, pool heater 75.00  
3 LP Gas system (1 tank, 1 meter, 2 outlets) 75.00  
4 LP Gas tank(s) 75.00  
5 Minimum permit (one inspection) 85.00  
6 Plan review (per 1/4 hour, minimum 1/2 hour) 25.00  
7 Radon mitigation  75.00  
8 Demolition 125.00  


   

Zoning:

(1) Zoning Compliance Letter 144.24  
(2) Re-inspection:
 

    a.  Single-Family/Duplex 59.14  

    b.  Multi-Family 176.40  

    c.  Non-Residential 176.40  
(3) Sign review for installation or alteration 84.05  
(4) Expedited plan review, per hour (one hour minimum) 91.31  

Fire:


Plan Review:
 

    a. 2,500 sqft and under
198.20  

    b. More than 2,500 sqft Plus, per sqft $.06 198.20  

    c. Single station smoke detector, per residential unit 61.22  

    d. Major plan revision, per hour 101.69  

    e. Minor plan revisions (correction, lost plans-Review not to exceed 15 minutes) 24.90  

    f. Expedited plan review, per hour ( one-hour minimum) 92.35  
(8) Re-inspection Fee 189.89  

Sec. 3-7. Engineering Administrative and User Fees.


Development services/engineering administrative and user fees shall be as follows:    
(1) Land clearing permit 198.20  
(2) Renewal of land clearing permit 59.14  
(3) Excavation permit 198.20  
(4) Renewal of excavation permit 59.14  
(5) Land filling permit 181.59  
(6) Renewal of land filling permit 59.14  
(7) Permit for installation and connection of sewers:    

    a. Residential 39.43
 

    b.Commercial 64.33  

    c. Industrial 130.75  
(8) Improvements within public rights-of-way

 

    a. Per lance cut for pavement excavation
203.38
 

    b. Per each 100 linear feet of off-pavement excavation
78.86
 

    c. Driveway permit
130.75
 

    d. Lost plans - Driveways only
78.86
 

    e .All other improvements not specified above
81.97
 
(9) Excavation in right-of-way
   

(other than driveway approach or apron), cash bond of 2,509.15  
(10) Publicly dedicated easements:    

    a. Dedication 414.04  

    b. Vacation 414.04  
(11) Engineering fee for on-site water and sewer connections:
 

2% of construction costs (minimum of $392.25)
 
(12) Change of contractor
39.43  
(13) Overtime request - Inspections, per hour
181.59  
(14) Overtime request - Plan review, per hour
181.59  
(15) Expedited plan review, per hour (one hour minimum)
181.59  
(16) Lost plan reviews (replacement of on-site plans)
181.59  
(17) MS4/NPDES, per inspection (not to exceed $250.00)
56.03  
(18) Plan revision fee
181.59  
(19) Re-inspection fee
120.37  
(20) Work without a permit: Double permit fee