(A) |
Expired Permit Fees |
|
|
1 |
Renewal-expired permits - All disciplines: |
|
|
|
a. Fifty percent (50%) of original master permit fee, minimum… |
103.77 |
|
(B) |
Miscellaneous Fees |
|
|
1 |
All construction include educational & training fees (per
thousand of estimated cost) |
0.21 |
|
2 |
Electronic water meters, per building |
59.14 |
|
3 |
Retrofit burglar alarms, per building* (state law governs) NO CPI INCREASE ALLOWED |
55.00 |
|
4 |
Certificate of occupancy: |
|
|
|
a. Standard - No Charge |
N/C |
|
|
b. Temporary, per residential units, per unit per 30 days |
64.59 |
|
|
c. Temporary, partial or stocking for commercial and other non-residential buildings (for each 30 day period): |
238.67 |
|
5 |
Permit card replacement- all disciplines |
19.19 |
|
6 |
Temporary construction-related structure |
64.59 |
|
7 |
Public art fees |
|
|
|
a. New building construction / redevelopment: |
|
|
|
1. Public Art fund contribution, per sqft of gross floor area |
0.51 |
|
|
2. On site artwork, per sqft of gross floor area |
0.66 |
|
|
b. Remodeling/converting: |
|
|
|
1. Public Art contribution, per sqft of gross floor area being remodeled |
0.25 |
|
|
2. On site artwork, per sqft of gross floor area being remodeled |
0.33 |
|
8 |
Temporary Use Permit |
64.59 |
|
(C ) |
Building Permit Fees |
|
|
1 |
New Construction - residential |
|
|
|
a. New Construction - Residential: Structural - % of total
construction value |
0.90% |
|
|
b. New Construction - Residential: Electrical - % of total
construction value |
0.33% |
|
|
c. New Construction - Residential: Plumbing - % of total
construction value |
0.15% |
|
|
d. New Construction - Residential: Mechanical - % of total
construction value |
0.14% |
|
2 |
New Construction - commercial |
|
|
|
a. New Construction - Commercial: Structural - % of total
construction value |
0.64% |
|
|
b. New Construction - Commercial: Electrical - % of total
construction value |
0.36% |
|
|
c. New Construction - Commercial: Plumbing - % of total
construction value |
0.09% |
|
|
d. New Construction - Commercial: Mechanical - % of total
construction value |
0.06% |
|
3 |
Residential additions |
|
|
|
a. Residential Additions: Structural |
2.90% |
|
|
b. Residential Additions: Electrical |
0.83% |
|
|
c. Residential Additions: Plumbing |
1.24% |
|
|
d. Residential Additions: Mechanical |
0.62% |
|
4 |
Residential
Alterations: |
|
|
|
a. Structural: % of total construction value unless
otherwise provided below, in subsections (1), (2) |
3.0% |
|
|
(1) The value of counter tops shall be deducted from the total
construction value. |
|
|
|
(2) The value of cabinet replacement only will be a min. of $176.40 or 2% of total construction value, whichever is greater shall be
charged herein |
176.40 |
|
|
b. Electrical: % of
total construction value |
0.93% |
|
|
c. Plumbing: % of total construction value |
1.14% |
|
|
d. Mechanical: % of
total construction value |
1.14% |
|
5 |
Commercial alterations/additional/tenant improvements: |
|
|
|
a. Structural: % of
total construction value |
1.97% |
|
|
b. Electrical: up to - $124,524 -% of total construction
value |
1.86% |
|
|
over $124,524 - per inspection |
57.07 |
|
|
per hour plan review fee |
106.88 |
|
|
c. Plumbing: Up to $124,524 - % of total construction value |
1.34% |
|
|
over $124,524 - per inspection |
57.07 |
|
|
per
hour plan review fee |
106.88 |
|
|
d. Mechanical: Up to $120,000 - % of total construction value |
0.83% |
|
|
over $120,000 - per inspection |
57.07 |
|
|
per
hour plan review fee |
106.88 |
|
6 |
Re-inspection - all disciplines (each re-inspection): |
52.14 |
|
|
Upon fifth and subsequent disapprovals, and without a certified supervisor or representative at the job site at time of inspection, the applicable fee shall be doubled. "Certified," for the purposes of this ordinance, shall include the following: |
|
|
|
a.The qualifier (person authorized by state and county authorities to apply for and receive a building permit); or |
|
|
|
b. A representative for the contractor that has a recognized master (or Class "A" certified) or journeyman status in the appropriate trade; or |
|
|
|
c. A representative for the contractor that has a State of Florida license in architecture or engineering and has sufficient education and knowledge in the appropriate field. |
|
|
7 |
Lost plan review (replacement of on-site plans: sfr, multi, commercial, covers all
disciplines) |
79.64 |
|
8 |
Plan re-submittal fee (for 3rd and subsequent re-submittals) |
52.14 |
|
9 |
Open permit request - per request |
32.94 |
|
10 |
Change in contractor and/or subcontractor - all disciplines |
39.69 |
|
11 |
Contractor overtime request-plan review per hr, minimum |
91.31 |
|
12 |
Expedited plan review, per hour, per trade (one hour minimum) |
91.31 |
|
(D) |
Structural Permit Fees |
|
|
1 |
Administrative fees |
59.14 |
|
2 |
Awning (each): Base fee |
82.75 |
|
plus per awning |
26.98 |
|
3 |
Deck (wood) |
171.22 |
|
4 |
Demolition/blasting |
97.80 |
|
5 |
Fence - base fee |
59.14 |
|
|
plus, per lineal foot |
0.25 |
|
6 |
Landscape affidavit |
39.69 |
|
7 |
Garage door |
64.59 |
|
8 |
Gutters |
64.59 |
|
9 |
House moving filing fee within the City of Coral Springs |
263.83 |
|
10 |
Hurricane Shutters ( SFR duplex, triplex - each multi-family, commercial, per floor): |
|
|
|
a. 1-3 shutters |
64.59 |
|
|
b. Each additional shutter |
5.44 |
|
11 |
Major plan revision (work not to exceed 1 hour) |
110.77 |
|
12 |
Masonry wall - base fee |
64.59 |
|
|
plus, per lineal foot |
0.45 |
|
13 |
Minimum fee (one inspection) |
59.14 |
|
14 |
Minor plan revision (corrections, lost plans, work not to exceed 15 minutes) |
40.72 |
|
15 |
Pool/spa/hot tub |
151.76 |
|
16 |
Roofs/re-roofs: |
|
|
|
a. Flat re-roof: |
127.89 |
|
b. Flat re-roof ( commercial): |
|
|
|
1. First 50 squares |
127.89 |
|
|
2. Each additional 50 squares |
59.14 |
|
|
c. Re-roof slope |
160.32 |
|
|
d. Roof repair (2 squares and under) |
59.14 |
|
|
e. Roof slope and flat |
290.55 |
|
17 |
Satellite dish ( over 18" requires separate electric permit) |
84.83 |
|
18 |
Screen enclosure - pool |
110.77 |
|
19 |
Signs (unlighted, permanent or temporary) |
84.83 |
|
20 |
Slab ( porch, patio, monolithic) |
91.31 |
|
21 |
Tent ( any size, each) |
59.14 |
|
22 |
Trailer (construction, storage, each) |
157.21 |
|
23 |
Window/door replacement |
59.14 |
|
|
plus $5.44 per unit |
|
|
24 |
Demolition |
97.80 |
|
25 |
Per hour plan review fee ( minimum of one hour) |
88.20 |
|
(E ) |
Electrical Permit Fees |
|
|
1 |
A/C change out |
96.76 |
|
2 |
Meter can |
59.14 |
|
3 |
Burglar alarm, new and retrofit (per floor up to 6 units) with each additional unit at a cost of $5.25 each: |
55.00 |
|
4 |
Commercial site lighting: |
|
|
|
a. 1-3 light standards |
59.14 |
|
|
b. Each additional light standard |
13.49 |
|
5 |
Computer systems (commercial, per floor) |
121.67 |
|
|
Computer systems pre-wire (per floor) |
59.14 |
|
6 |
Electric sign (each) |
96.76 |
|
7 |
Electronic water meters, per unit |
7.78 |
|
8 |
Energy management system |
59.14 |
|
9 |
Fire alarm ( sfr, duplex, triplex - each multifamily, commercial, per floor) |
147.35 |
|
10 |
Heat pump |
112.84 |
|
11 |
Low voltage- individual systems per system (minimum fees): |
|
|
|
a.Sprinkler time clock, new installations only : |
|
|
|
1. 1-3 time clocks |
59.14 |
|
|
2. each additional time clock |
7.78 |
|
12 |
Major plan revision (work not to exceed 1 hour) |
110.77 |
|
13 |
Minimum fee (one inspection) |
59.14 |
|
14 |
Minor plan revision ( corrections, lost plan, work not to
exceed 15 min) |
40.72 |
|
15 |
Pool/spa/hot tub/fountain |
176.40 |
|
16 |
Pool alarm system |
59.14 |
|
17 |
Radon mitigation (per unit) |
59.14 |
|
18 |
Satellite dish ( requires separate structural permit) |
103.25 |
|
19 |
a. Service Change: Residential |
95.72 |
|
|
b. Service Change: Commercial |
121.67 |
|
20 |
Sprinkler Pump, heat pump |
110.77 |
|
22 |
Temporary electric |
79.64 |
|
|
30-day temporary electric |
51.10 |
|
23 |
Trailer (construction, sales, etc…) |
100.13 |
|
24 |
Demolition |
97.80 |
|
25 |
Per hour plan review fee ( a minimum of one hour) |
88.20 |
|
(F) |
Plumbing Permit Fees |
|
|
1 |
Backflow preventer (new installation only), min. fee |
84.83 |
|
2 |
Electronic water meters, per unit |
6.48 |
|
3 |
Fire sprinkler system |
201.31 |
|
4 |
Gas pool heater |
65.63 |
|
5 |
LP Gas system ( 1 tank, 1 meter, 2 outlets) |
65.63 |
|
6 |
LP Gas tank(s) |
65.63 |
|
7 |
Major plan revision (work not to exceed 1 hour) |
110.77 |
|
8 |
Minimum fee (one inspection) |
59.14 |
|
9 |
Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) |
40.72 |
|
10 |
Sewer hook-up |
65.63 |
|
11 |
Site work, drainage, water mains, fire, sewer mains - % of
contract price |
2% |
|
12 |
Solar pool heater/water heater |
84.83 |
|
13 |
Water heater (domestic water) |
65.63 |
|
14 |
Water well 2" - 4 1/2 " |
65.63 |
|
15 |
Demolition |
97.80 |
|
16 |
Per hour plan review fee ( minimum of one hour) |
88.20 |
|
(G) |
Mechanical Permit Fees |
|
|
1 |
A/C change out |
97.80 |
|
2 |
Gas, pool heater |
65.63 |
|
3 |
LP Gas system (1 tank, 1 meter, 2 outlets) |
65.63 |
|
4 |
LP Gas tank(s) |
65.63 |
|
5 |
Major plan revision (work not to exceed 1 hour) |
110.77 |
|
6 |
Minimum permit (one inspection) |
59.14 |
|
7 |
Minor plan revision ( corrections, lost plans, work not to exceed 15 minutes) |
40.72 |
|
8 |
Radon mitigation |
65.63 |
|
9 |
Demolition |
97.80 |
|
10 |
Per hour plan review fee ( a minimum of one hour) |
88.20 |
|
|
In addition to the fees above, the applicant should review the requirements of Chapter 5 of the Code of Ordinances and any other applicable codes. |
|
|
|
Zoning: |
|
|
(1) |
Zoning Compliance Letter |
144.24 |
|
(2) |
Re-inspection: |
|
|
|
a. Single-Family/Duplex |
59.14 |
|
|
b. Multi-Family |
176.40 |
|
|
c. Non-Residential |
176.40 |
|
(3) |
Sign review for installation or alteration |
84.05 |
|
(4) |
Expedited plan review, per hour (one hour minimum) |
91.31 |
|
|
Fire: |
|
|
|
Plan Review: |
|
|
|
a. 2,500 sqft and under
|
198.20 |
|
|
b. More than 2,500 sqft Plus, per sqft $.06 |
198.20 |
|
|
c. Single station smoke detector, per residential unit |
61.22 |
|
|
d. Major plan revision, per hour |
101.69 |
|
|
e. Minor plan revisions (correction, lost plans-Review not to exceed 15 minutes) |
24.90 |
|
|
f. Expedited plan review, per hour ( one-hour minimum) |
92.35 |
|
(8) |
Re-inspection Fee |
189.89 |
|
|
Sec. 3-7. Engineering Administrative and User Fees. |
|
|
|
Development services/engineering administrative and user fees shall be as follows: |
|
|
(1) |
Land clearing permit |
198.20 |
|
(2) |
Renewal of land clearing permit |
59.14 |
|
(3) |
Excavation permit |
198.20 |
|
(4) |
Renewal of excavation permit |
59.14 |
|
(5) |
Land filling permit |
181.59 |
|
(6) |
Renewal of land filling permit |
59.14 |
|
(7) |
Permit for installation and connection of sewers: |
|
|
|
a. Residential |
39.43
|
|
|
b.Commercial |
64.33 |
|
|
c. Industrial |
130.75 |
|
(8) |
Improvements within public rights-of-way
|
|
|
|
a. Per lance cut for pavement excavation
|
203.38
|
|
|
b. Per each 100 linear feet of off-pavement excavation
|
78.86
|
|
|
c. Driveway permit
|
130.75
|
|
|
d. Lost plans - Driveways only
|
78.86
|
|
|
e .All other improvements not specified above
|
81.97
|
|
(9) |
Excavation in right-of-way
|
|
|
|
(other than driveway approach or apron), cash bond of |
2,509.15 |
|
(10) |
Publicly dedicated easements: |
|
|
|
a. Dedication |
414.04 |
|
|
b. Vacation |
414.04 |
|
(11) |
Engineering fee for on-site water and sewer connections: |
|
|
|
2% of construction costs (minimum of $392.25) |
|
|
(12) |
Change of contractor
|
39.43 |
|
(13) |
Overtime request - Inspections, per hour
|
181.59 |
|
(14) |
Overtime request - Plan review, per hour
|
181.59 |
|
(15) |
Expedited plan review, per hour (one hour minimum)
|
181.59 |
|
(16) |
Lost plan reviews (replacement of on-site plans)
|
181.59 |
|
(17) |
MS4/NPDES, per inspection (not to exceed $250.00)
|
56.03 |
|
(18) |
Plan revision fee
|
181.59 |
|
(19) |
Re-inspection fee
|
120.37 |
|
(20) |
Work without a permit: Double permit fee
|
|
|